Final beam for new Mission Integration Facility
Several members of the construction project for the Air Force Nuclear Weapons Center’s new Mission Integration Facility at Hill AFB, Utah, signed the beam that was placed on the highest point of the structure March 4, 2022. In keeping with tradition, an evergreen tree was affixed to the beam before it was lifted. The facility is scheduled to be completed by July 2023.